Home   |   About Us   |   Accreditation   |   Case Studies   |   Videos   |   News   |   Contact Us
Pumps & Pumping
  Ballybay Flood Defence Scheme
  Knightsbrook Hotel Foul Drainage
  NI Water septicity dosing
  River Fergus, Ennis Flood Scheme
  Newtownards Flood Relief Scheme
  Munster Blackwater Flood Drainage
  Croke Park Stormwater Pumping
Wastewater Treatment
  6 Water Treatment Works Upgrade
  Fane Valley Effluent Treatment Plant
  Fermanagh Villages Sewage Scheme
  Hilton Hotel Malta wastewater solution
  Libyan Oil Fields - temporary wwtp
  MBR - Quality Eggs, Ireland
Stormwater Management
  Topaz Filling Station
  Newtownards Flood Relief scheme
  Rapid Build Schools, Ireland
  KFC Inverness, Scotland
  Mell Housing, Ireland
  Lidl Supermarket Group
Grease Management
  Dublin FOG Management Plan
  International Airports
  McDonalds Eastern Europe
  Grease Guardian Paris
Services
  Louth Co Council Asset Management
  Wexford Co Council Pump Framework
  NI Water - NIW C057 Framework



Case Studies


Croke Park Stormwater Pumping
   
Client:
Completion date:
Contract Value:
Haughton & Young for Croke Park
01/09/2010
75,000
   
Project Overview:

The project enabled the relief of flooding problems at the Croke Park GAA football stadium in Dublin. Work included the design, supply and installation of the main storm pump station and the upgrade of four small drainage pump stations that pump to it. The main 4-pump storm relief pump station operates on Duty/Assist/Assist/Standby

Flow rates of pumps:   4 No. Flygt pumps each rated at 148 l/s (443 l/s peak flow)

   
Scope Of Work:

4 No Submersible pumps complete with pipework, valves, MCC, Ultrasonic controls. Refurbishment and upgrade of four outlying feeder pump stations including all pumps, pipework and controls.

 
 

address: Greenbank Industrial Estate, Newry, BT34 2QX, N. Ireland
      
tel: +44(0) 28 302 66616 email: sales@fmenvironmental.com
  © 2012 FM Environmental Limited. All Rights Reserved.
             

Designed By Eweb