Home   |   About Us   |   Accreditation   |   Case Studies   |   Videos   |   News   |   Contact Us
Pumps & Pumping
  Ballybay Flood Defence Scheme
  Knightsbrook Hotel Foul Drainage
  NI Water septicity dosing
  River Fergus, Ennis Flood Scheme
  Newtownards Flood Relief Scheme
  Munster Blackwater Flood Drainage
  Croke Park Stormwater Pumping
Wastewater Treatment
  6 Water Treatment Works Upgrade
  Fane Valley Effluent Treatment Plant
  Fermanagh Villages Sewage Scheme
  Hilton Hotel Malta wastewater solution
  Libyan Oil Fields - temporary wwtp
  MBR - Quality Eggs, Ireland
Stormwater Management
  Topaz Filling Station
  Newtownards Flood Relief scheme
  Rapid Build Schools, Ireland
  KFC Inverness, Scotland
  Mell Housing, Ireland
  Lidl Supermarket Group
Grease Management
  Dublin FOG Management Plan
  International Airports
  McDonalds Eastern Europe
  Grease Guardian Paris
Services
  Louth Co Council Asset Management
  Wexford Co Council Pump Framework
  NI Water - NIW C057 Framework



Case Studies


6 Water Treatment Works Upgrade
   
Client:
Completion date:
Contract Value:
NI Water (Quinn Automatic Ltd)
June 2015
   
Project Overview:

Sites: Derg WTW, Lough Bradan WTW, Lough Fea WTW, Glenhordial WTW, Caugh Hill WTW, Carmoney WTW

The old turbidity monitors at the six Water Treatment Works (WTWs) were becoming obsolete. Spare Parts could not be obtained and calibration of the instruments was becoming more and more difficult. The accuracy of the older instruments were also not to the standard required.

Northern Ireland Water (NI Water) therefore approved a Contract to replace 82 instruments across the 6 sites, as well as install 4 new instruments.

The 86 new instruments were a mixture of contact type (flow through) instruments and falling stream or overflow (non contact) type instruments.

The purpose of the Contract was therefore to replace existing unsupported equipment with new equipment. Ancillary equipment also had to be refurbished and/or replaced.

A major aspect of the Contract was the Methodology between FM and the plant operators to ensure that the Water Treatment Works remained fully operational, while old instruments were being replaced and new instruments installed.

The other major aspect of the Contract was to interrogate the old instruments before they were removed to determine the ranges of the 4-20ma analogue signals being sent to the WTW SCADA system. It was critical that theses ranges were determined and inserted into the new instruments, to maintain WTW plant operation.

All works were carried out on fully operational Water Treatment Works so following Water Hygiene guidelines and legislation to prevent cross contamination was of upmost importantance.

FM Environmental Ltd were fully responsible for all the M&E works, Consultant/Client liason and H&S Management  involved in the project.

   
Scope Of Work:

 Key M&E Equipment Supplied, Installed & Commissioned:

  • 26 No. Sigrist Aquascat Non-Contact Turbidity Monitors
  • 55 No. Hach Lange 1720E Contact Turbidity Monitors
  • 2 No. Hach Lange Surface Scatter 7 Non-Contact Turbidity Monitors
  • 3 No. Hach Lange Solitax SC Contact Turbidity Monitors
  • PVC Pipework, Valves and VA Flowmeters
  • De-Bubbblers
  • Flow Throttling Flowmeters
  • PSU’s (Power Supply Units)
  • Cabling and Cable Containment
  • Local Isolation
  • Analogue Signal Cabling 

 
 